LCD touch control 11 level adjustment II LED 700500 pet operating lamp
The II LED shadowless Operating Light is used for all kinds of operation areas, streamlined design meets the requirements of modernization in laminar flow operation room.
With over 50,000hours effective working life, and each led bulb could be replaced so that could extremely save the hospitals maintence cost. Medeco Led light have high reliability as it apots top-level LED moulder,that Germany Imported OSRAM LED bulb light source.
Medeco II LED is easy cleaning and can save much more space,Using Germany Ondal Square Arm could rotating 360degree unlimited ,which ensure the light to be move easily and freely.
The sterilzier handling for led operation lamp adopts high strength plastic material and can be sterilized by autoclave 135ºC and more than 3000times.
FEATURES:
1. Double LED lamp head: 700 lamp head, 500 lamp head
2. Triple ceiling arms(Chinese Round Arm)
3. Triple Balance Arms (Chinese Round Arm)
5. SONY HD Camera System
6. Medical Monitor(Full HD Medical Level, 22inch SDI interface)
7. Four sterilizer handling
II SERIES LED OPERATING LIGHT CONFIGURATIONS
LED 700/700(700mm+700mm Lamp Head)
LED700/500(700mm+550mm Lamp Head)
LED 500/500(700mm+550mm Lamp Head)
LED 700 (700mm Lamp Head)
LED 500 (550mm Lamp Head)
II SERIES LED OPREATING LAMP (II SERIES 700/500) |
Technical specifications for lights |
II LED700 |
II LED500 |
Central illuminance at 1m working distance |
40,000~16,0000 lux |
40,000~130,000 lux |
Focusable light-field size at 1 m distance |
120~300mm |
120~300mm |
Colour temperature |
3500~5000K |
3500~5000K |
Depth of Focus |
>700mm |
>700mm |
Colour Index Ra |
95 |
95 |
Power Supply |
110~240V 50/60Hz |
110~240V 50/60Hz |
Effective bulb service life |
>50,000h |
>50,000h |
Diameter of lamp housing |
700mm |
500mm |
Power consumption of light heads(W) |
60 |
48 |
Installation height (Ceiling type) |
280-320 cm |
280-320 cm |
FAQ:
1. If your company support OEM ?
Yes, we support OEM, You just sent me our your logo and requirement, we will print th logo in the products and nameplate.
2.What's our payment ways and methods?
Our payment ways is T/T: 30% before producing, and 70% before shipping the products.
L/C at sight and westunion.
3.Whats terms of the transaction ?
Our general quotation is EXW, after confirm details quantity with customer, will quote CFR.
We also support DDP.
4. Whats our delivery time for led light ?
For samll pc such as 1 pcs , the exact delivery time is about 5 days after get the payment.
For large pcs,such as 100 pcs, about one month after receive the advance payment.